
The Old Gotthard Tunnel Route - Driver's Eye View
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Top cast
Where to watch
- Type
- —
- Starts
- Not available
- Ends
- Not available
- Category
- Not available
- Type
- —
- Starts
- Not available
- Ends
- Not available
- Category
- Not available
- Type
- —
- Starts
- Not available
- Ends
- Not available
- Category
- Not available
- Type
- —
- Starts
- Not available
- Ends
- Not available
- Category
- Not available
- Type
- —
- Starts
- Not available
- Ends
- Not available
- Category
- Not available
- Type
- —
- Starts
- Not available
- Ends
- Not available
- Category
- Not available
- Type
- —
- Starts
- Not available
- Ends
- Not available
- Category
- Not available
- Type
- —
- Starts
- Not available
- Ends
- Not available
- Category
- Not available
Not currently available on the supported providers in EG.
Availability can change as licenses rotate — confirm on the provider’s page before subscribing. Last checked: 14 Jul 2026.
